0
The project includes the construction of a new run-of-river hydropower plant incl. adaptions and new constructions of water intakes and weirs. Beside increasing the generation of renewable hydropower by approx. 120 GWh, flood protection measures are improved and compensation & mitigation measures improve the aquatic and terrestrial ecologic conditions.
Visit site