Response to ACER survey on the structural congestions in the electricity grids

16 June 2023

Introductive comment

First, ACER’s communication on this survey refers to an amendment of a definition of the CACM Regulation, but the survey explicitly calls for amending two definitions of the Electricity Regulation and not CACM Regulation. We understand that the definition of “structural congestion” might be rediscussed eventually in the context of CACM 2.0 but this should not be in the framework of the EMD amending E. Regulation. Is it the intention of ACER to re-open E. Regulation for changing this definition and when ?

Second, what is the legal basis and motivations of this consultation and the objective pursued ? We do not see any justification for such survey, notably in the last Technical report on structural congestion by ENTSOE (2021). Structural congestions play a role in the assessment of alternative bidding zone configurations. It makes sense to place bidding zone borders at the location of structural congestions. However, that can only be one indicator amongst others. An optimal bidding zone configuration is based on the assessment of overall market efficiency defined by several criteria.

Finally, while Eurelectric can justify an expertise enabling to answer, we would like that ACER clarifies why the survey targets experts only and is not an usual consultation towards all stakeholders.

Do you have any suggestions for improvement of the definition of congestion in Article 2(4) of the Regulation EU 2019/943?

In consistency with the references to congestion in E. Reg and CACM (and definition of physical congestion in CACM), the definition of the congestion could be improved to:

  • Clarify a congestion corresponds to the situation before any remedial action is undertaken
  • This situation is to be defined as close as possible to real time operations.

 Do you have any suggestions for improvement of the definition of structural congestion in Article 2(6) of the Regulation EU 2019/943?

In the current definition, the stability / durability over time is very crucial to characterize the fact that a congestion is said to be “structural”.

The definition could be improved to include the notion of depth and frequency of occurrence of congestion.

Any implication of changing such definition notably with regard to the BZR process and associated methodology should be cautiously assessed.

Considering the definitions of congestion and structural congestion provided above, what is in your opinion a minimum percentage of time the congestion should exist between two network areas (which can be bidding zones, or parts of them), in order to define the congestion between these two areas as structural?

Only values of at most 100 are allowed:          %

Please provide any additional input to complement the answer to the previous question.

First of all, we would like to emphasize that a criterion with a single threshold on the frequency of occurrence of congestion is probably too simplistic and not sufficient to characterize the fact that congestion is “structural”.

Eurelectric does not propose any threshold because it might be very arbitrary, in the absence of any relevant methodology to define it.

We believe that neither E. Regulation nor CACM GL are the right place to determine the level of a threshold. In case a threshold is to be defined, a detailed methodology should be developed and made public, to assess the adequate level of the threshold. At this stage, we think it is more cautious to keep some latitude to determine this threshold in the frame of a subsequent methodology to be developed by ENTSO-E.

In addition to the frequency of occurrence, the depth of a congestion (i.e. size) and its durability over time would be additional characteristics for which thresholds could be relevant as well.

All this should be publicly consulted and defined in the framework of the development of above-mentioned methodology. To that end, we recommend ACER to consider in relation with TSOs and ENTSOE, in full transparency with market participants, the opportunity to define the relevant threshold – if any – either at EU level or at national level.

Related news

Related publications

Connecting and accelerating e-mobility across Europe.
More than a tool: Utilities and tech firms leading the charge in unlocking the potential of AI.
Community of leading companies powering Europe's energy transition. Add how many companies are BAs, make it visible.
Accelerating power system decarbonisation by moving towards 24/7 carbon free energy matching.
Europe's electricity production, demand, prices, capacity, CO2 emissions, and cross-border flows.
An annual report that provides a comprehensive analysis of the electricity and energy market trends in Europe.